a scaffold must be erected plumb, square and level becausedavid gunderson obituary

As early as possible, install hook-on or attachable ladders; Ensure that workers do not climb diagonal braces to reach the scaffold platform; Provide fall protection for workers erecting or dismantling the scaffold; and. Move the scaffold into your desired position, and make sure it is level and secure. Where the platform will not be more than 14 inches from the face of the work (18 inches for plastering and lathing operations), fall protection is not required. He suffered multiple fractures to the head, left and right foot, and left wrist, and torn ligaments in the knees. [. Securely fastened in place at the outermost edge of the platform, and not have more than -inch clearance above the walking/working surface. The planking used must be "scaffold grade.". The poles, legs, or uprights of scaffolds must be plumb, and securely and rigidly braced to prevent swaying and displacement. 22.B.12 Scaffolds shall be plumb and level unless engineered and designed to contour as the structure does. Posts shall be erected plumb in all directions, with the first level of runners and bearers positioned as close to the base as feasible. Unsafe scaffolding has the potential to result in death or serious . Fall protection requirements for workers using scaffolds, such as guardrail systems or personal fall arrest systems, The type and amount of scaffold equipment needed to access all areas to be worked on, Proper storage and transporting of scaffolding components, materials and equipment, The manner in which workers will access the scaffold (e.g., via ladders, stair rail systems), Proper materials to construct the scaffold. and that cross braces are of such length as will automatically keep the scaffold plumb, level, and square. [, Ends of rails may not extend beyond their terminal posts, unless they do not constitute a projection hazard to employees. Be supported by bearing blocks securely attached to the poles. Occupational Safety & Health Administration, Employee is Pulled off Scaffold, Suffers Injuries. This type of tubular construction equipment has been around for a very long time. All diagonal . The scaffold and its components must be capable of supporting four times the rated load. An employee was constructing the third level of a tubular, welded-frame scaffold while standing on the second level. Therefore, assessing personnel abilities should be a part of all phases of the scaffolding inspection. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the direct supervision of a scaffold competent person. Supported scaffold poles, frames, uprights, etc. Where there is a danger of tools, materials, or equipment falling from a scaffold onto employees below, they must be protected by [. [29 CFR 1926.451(g)(2)], The employer must designate a competent person, who would be responsible for determining the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. Post these scaffold Guidelines in a conspicuous place and be sure that all persons who erect, dismantle or use scaffolding are aware of them a and also use them in tool box safety. Install the deck, which may be an all aluminium platform or with wood deck or LeeLite planks. When toeboards are used for falling object protection, they must be [. He fell, sustaining a concussion for which he was hospitalized. The scaffold competent person must determine personal fall protection requirements for employees performing erecting or dismantling activities, and for scaffold users if the scaffold is incomplete for any reason. Supported scaffold poles, legs, posts, frames, and uprights shall be plumb (i.e. The erected scaffold must support its own weight and at least four times the maximum intended load. [, Slip-resistant surfaces on treads and landings. Do not force frames or braces to fit - level the scaffold until proper fit can easily be made. The number one scaffold hazard is worker falls. Is secured to prevent lateral movement. Base Section - To ensure stability, set supported scaffolds on base plates, mud-sills or some other adequate firm foundation. Ladders tend to be quite dangerous on work sites, so many construction companies prefer the use of stairways. Workers are most vulnerable to fall hazards when climbing on or off a scaffold. Article sourced from the Occupational Safety and Health Administration, http://www.OSHA.gov. Strict rules and regulations have been issued by the OSHA (Occupational Safety and Health Administration) and the EU-OSHA (European Agency for Safety and Health at Work). Review blueprints, work orders, the project schedule and other written requirements to determine where these scaffolds should be used. (Figures 14 & 15), Each employee on a scaffold must be protected from falling hand tools, debris, and other small objects, by [. [, As frames are stacked, cross braces must be of such length as will automatically keep the scaffold plumb, level, and square. (j) Scaffold planks must extend over their end supports not less than 6 inches nor more than 18 inches. Erectors and dismantlers face additional access problems due to the incomplete condition of the scaffolding. Hardware should be included to fasten the planks into place. In some cases, you may choose a new. The technical storage or access that is used exclusively for anonymous statistical purposes. Be sure scaffold stays plumb and level as . When the other end of the 2x4 slipped off the bucket, the employee did not let go of his end, and was pulled off the deck. Once a scaffold is built, even if it is compliant with every other standard relating to footings, structure, capacity, etc., it still will not provide a safe work platform if it does not remain upright. Before beginning dismantling procedures, reconstruct and/or stabilize the scaffold as necessary. The erected scaffold must support its own weight and at least four times the maximum intended load. Haul Scaffolding Safely. When a supported scaffold reaches a height that is more than four times its minimum base dimension (4:1), it must be restrained by guys, ties, or braces to prevent it from tipping. d. Scaffold legs shall be set on adjustable bases or plain bases placed on mud sills or other foundations adequate to support the maximum intended load. Most screw jacks will have a built-in stop so that the maximum height cannot be exceeded. The cross braces shall be of such length as will automatically square and align vertical members so that the erected scaffold is always plumb, level, and square. Personal Fall Arrest System. or more per square foot. [, Nothing that could cause a slip, trip or fall (i.e. They should be installed along all open sides and at both ends of platforms, except when used as a walkway, the platform is the main working area of the scaffold. Learn how your comment data is processed. This is one more reason for always using fall protection. bucks) must be joined together vertically by coupling or stacking pins (or equivalent means). Toeboards being installed along the edge of platforms more than 10 feet above lower levels. PLUMB/LEVEL/SQUARE. (l) Use a tag line when hoisting materials onto a scaffold. Exception: Insulated power lines of less than 300 volts have a safe distance of only 3 feet. And frames that stick out past the side of the bed can be . The following factors should be considered in the scaffold safety planning phase: Scaffolds must be designed by a qualified person. (, Midrails, screens, mesh, intermediate vertical members, solid panels, etc., must be able to withstand a force of at least 150 pounds applied in any downward or horizontal direction, at any point along the midrail or other member. [, In addition to meeting the requirements of, When vertical lifelines are used, they must be fastened to a fixed safe point of anchorage, independent of the scaffold, and be protected from sharp edges and abrasion. All scaffolding products available at scaffoldframe.com meets OSHA and ANSI standards, and have a 5 year warranty*. In general, a level is the easiest way to achieve the desired right angles. To make sure the scaffold is level, use a level on a horizontal support or bearer. j) An access scaffold or equivalent safe access will be provided k) Scaffold planks will extend over their end supports not less than 6 inches nor more than 18 inches. When the employee tried to set the third level frame into the pins of the second level, the frame he was trying to position flipped to one side. Where a platform changes direction (ex. The entire platform is attached to the fork. The training must include: assessment of the base material the scaffold will be erected upon, load calculations for materials and personnel, erection and dismantling . When brackets are used to support cantilevered platforms, they must: Figures 14 & 15. Crossbracing is required on both front and back sides of each scaffold buck or frame. Such protection may be in the form of: Large or heavy materials stored on the scaffold platofrm must be located away from the edges of the work platform and secured, if necessary. The jack-nut at the highest ground level should be set 7.5-15 cm (3-6 in.) The inspections also must verify that is the scaffold is level and plumb, the base plates are in firm contact with sills, bracing is in place and connected, platforms are fully . Uplift is the separation of a frame from the frame below it. (1) Scaffolds shall be properly braced by diagonal braces for securing vertical members together laterally, and the cross braces shall be of such length as will automatically square and align vertical members so that the erected scaffold is always plumb, square, and rigid. [, Be specifically designed and constructed for use as ladder rungs. [, A toprail of each stair rail system capable of serving as a handrail, unless a separate handrail is provided. Follow all state, local and federal codes, ordinance and regulations pertaining to scaffolding. Therefore, employers are required to provide safe scaffold access. Position the first level of bracing as close to the base as possible. Because the number of injuries from . [29 CFR 1926.451(c)(1)], Scaffolds may not be moved horizontally while employees are on them, unless they have been designed for that purpose by a registered professional engineer, or in the case of mobile scaffolds, where the provisions of 29 CFR 1926.452(w) are followed. Stability and durability are the key components for the scaffold towers to be safe. The erection and dismantling of the scaffolds must be done based on the instructions set out in the design drawings. Before starting any scaffold project, the employer should conduct a hazard assessment to ensure the safety of workers. Specific requirements are described below. In certain industries such as oil refinery, aviation, gas and chemical manufacture it is necessary to use glass fiber structures as these will not spark or corrode in situations where gasoline, solvents, electricity and so forth are present. Tube and coupler scaffold design must comply with 29 CFR 1926.451-.452. [, Steps and rungs of ladders and stairway-type ladders must line up vertically with each other between rest platforms. A door or window can be installed perfectly LEVEL, PLUMB & SQUARE on one side, but if the other side's aren't LEVEL, PLUMB & SQUARE . The space between the last plank and the uprights cannot exceed 9 1/2 inches. Not tied. Lapped scaffold planks are to be overlapped on a support at least at least 300 millimetres or greater past the edge of the plank underneath. We will deliver to you the highest quality property and casualty insurance programs and strategic planning consultation services in a manner that is most suitable to achieving your business goals. See Appendix A of Subpart L for non-mandatory toeboard guidelines. Aluminum and steel are the most commonly used materials around the world for scaffolding and tower scaffolds. Training shall include [. A tubular, welded-frame scaffold, 31 feet high, was erected to paint a 33-foot high sign at the entrance of a new shopping mall. Since it is an elevated platform, the stability decreases as the height increases. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the direct supervision of a scaffold competent person. Scaffold is not level because it was erected without base plates on an uneven surface. You will need many of each component for larger structures. Also they can be mobile or stationary. Guys, ties, and braces must be installed at locations where horizontal scaffold components support both inner and outer legs. Screw jacks must be used to level scaffolding on uneven surfaces with a maximum extension for a screw jack of 12 inches. If using wooden planks, they must extend beyond the supporting points [, Have rest platforms provided at a maximum of 35-foot vertical intervals. Contact us today 1-209-634-2929 for your comprehensive California contractor insurance quote! Check the level again and plumb if necessary. Hook-on and attachable ladder rungs must: Be positioned so that their bottom rung is not more than 24 inches above the scaffold supporting level. To accomplish this, the scaffold design must incorporate a realistic assessment of maximum intended loads on the scaffold at all stages of erection and loading. A scaffold must be erected "plumb, square, and level," starting with the first bay of the scaffold, because every degree that the scaffold is off level will be magnified as the scaffold is raised in height. All joints must be No University employee shall erect scaffold greater than or equal to 20 feet. Midrails must be capable of supporting at least 150 pounds applied in a downward or outward direction. Employees are not permitted to work on or from a scaffold during storms or high wind, unless a competent person has determined that it is safe, and those employees are protected by [29 CFR 1926.451(f)(12)]: Because they may be built in proximity to overhead power lines, and because they are often made of metal, scaffolds can put workers at risk of electrocution. Changes in the types of scaffolds, fall protection, falling object protection, or other equipment present a hazard for which an employee has not previously been trained. the side of a building) basically serves as the fall protection system. We pride ourselves on exceeding our clients expectations in every interaction to make sure that our clients know how much we value and appreciate their business. Plumb and level the scaffold as it is being erected. Scaffolding, also called scaffold or staging, is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other man-made structures.Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to. Standards are vertical pipes that are connected with clamps or couplers to give the structure its height; ledgers are horizontal braces that steady the structure and give it width. Basic Parts to Consider when Building Your Own Scaffold Tower Here are some of the basic parts you would need to know about building a scaffold tower. One exception is when the scaffold platform is within 14 inches of the face of the work. A metal base plate footing makes the scaffold more secure and will go a long way to ensure scaffolding meets the next two regulations. and must be provided on any scaffold 10 feet or more above a lower level. The Scaffold cross braces should never be used as a means of access. _____ 1. Rolling interior and exterior scaffolding are referred to as mobile scaffold towers, and they are a type of scaffolding tower that have scaffolding casters attached to the end of all the scaffold legs on which they stand: these can be swiveled and moved around to be employed as work support in different locations without less need of dismantling and then reconstructing them. When conditions warrant, the height of the top edge may exceed the 45-inch height, provided the guardrail system meets all other criteria. Scaffolds need to be erected plumb, level, squared and braced to . Install the deck, which may be an all aluminium platform or with wood deck or scaffold planks. (For mobile scaffolds, the maximum height of the screw jack is 12 inches.). For example, if the base width is three feet, the first vertical tie will be (3 feet x 4) 12 feet from the ground. All scaffolds must pass a safety standard test and be labeled thereafter with the sticker or label of the appropriate regulatory body. OSHA has standards that apply specifically to the steps that must be taken to assure a stable scaffold base. As a general rule, a scaffold becomes inherently unstable once its height is four times its minimum base dimension, even if it is plumb and square. To ensure the scaffold is "square", use a tape measure and measure the distance between opposite corners. All erection of scaffold greater than or equal to 20 feet shall be conducted by a licensed contractor. This will have an impact on what components you will need as well as how many of each component will be necessary to complete your tasks. [, Be used only to support personnel, unless the scaffold has been designed for other loads by a qualified engineer and built to withstand the tipping forces caused by other loads. Scaffolds are generally rated as light, medium or heavy duty and must be able to support the correlating weight of workers and materials required for each type. Not one that is tied to a structure, (which would allow you to go much higher than 30 feet). Plumb and brace poles, legs, posts, frames and uprights to prevent swaying and displacement. Inadequacies in an affected employee's work indicate that the employee has not retained the necessary proficiency. Scaffolding means a convenient platform for persons to work at height. Where platforms overlap to create a running scaffold, the overlap must occur only over a support and shall not be less than 12 inches unless nailed together. 1 . Also, note that the planks are bowing because the bricks are loaded at one point on the platform instead of being evenly distributed. Avoid propping the scaffolding frames up on the side of the bed. The legs, poles, frames, and uprights must bear on base plates and mud sills. Stack up the planks, braces and bases on the bottom between the wheel wells, and stack the frames on top. Note: Except where . Tube and coupler scaffold design must comply with 29 CFR 1926.451-.452. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you. [, Scaffold components manufactured by different manufacturers are not allowed to be modified to make them fit together, unless a competent person determines that the resulting scaffold is structurally sound. Has a platform that is at least 500mm wide. [, Employers are required to provide safe access for employees erecting or dismantling supported scaffolds where it is feasible, and where it does not create a greater hazard. In such cases, the platforms must be as wide as feasible, and fall protection must be provided. rather than a scaffolding set; the tower will be much shorter and easier to tear down and construct, though it will only be suitable for smaller jobs. PLUMB/LEVEL/SQUARE. Fall protection consists of either personal fall-arrest systems or guardrail systems, and must be provided on any scaffold 10 feet or more above a lower level. The momentum of the frame thrust the employee backward off the second level. Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills (or other adequate firm foundation). Screw jacks must be used to level scaffolding on uneven surfaces. Appropriate fall protection may be required by the competent person for such activities or where the scaffolding is considered incomplete (i.e. All brace connections must be secured to prevent dislodging. Scaffolds and scaffold components must be capable of supporting, without failure, their own weight and at least 4 times their maximum intended load. Design features include a rest platform every 35 feet, rungs at least 11 1/2 inches wide (8 inches for ladders built into the frame), and uniform rung spacing not exceeding 16 3/4 inches. While sitting or kneeling on a fixed deck plank attached to a fabricated frame scaffold, a worker was pulling a 16-foot long 2x4 off the bucket of an excavator. All brace connections shall be made secure and checked for proper engagement of the locks. Ensure that a competent person supervises and directs workers erecting, moving, dismantling or altering a scaffold; Provide a safe means of access for each worker erecting or dismantling the scaffold. Such a scaffold can be set up on either side of the building, and offers a great level of flexibility. Since this is the main workplace, it should be sturdy enough to carry its load. [, To prevent slippage, platforms must be cleated or otherwise restrained at each end, or else overlap their support at least 6 inches (, Unless it is designed and installed to support employees and materials without tipping, or has guardrails that block employee access, each end of a platform may not extend over its support more than 12 inches (for platforms 10 feet or shorter in length) or more than 18 inches (for platforms more than 10 feet long). System Scaffolding. It's best to have everything as low as possible so parts don't get blown or bounced out. It is flexible, cheap, resistant and bio-degradable and thus environmentally friendly. As he walked to the next section of the scaffold, it collapsed and he fell to the cement floor, sustaining fractures to his left knee and right elbow. General Guidelines. Check out our special shipping rates! Such retraining is required in at least the following situations [. CapacityScaffolds and scaffold components must support at least 4 times the maximum intended load. [, OSHA standards specifically forbid climbing cross-braces as a means of access. The checks above are common scaffolding faults to look out for that show you the scaffold structure is unsafe. Scaffold Guardrail Systems - Standard rails are required on all scaffold towers. To control the risk of a scaffold falling or collapsing, employers must assure that scaffolds are built within OSHA standards relating to strength and structural integrity. Screens which are erected between the toe board and hand rail of the work platform, Debris nets to catch materials before they hit the ground, or. The other five workers were hospitalized with electrical burns. If you need new scaffolding for larger jobs, you will need to determine how high and wide you are likely to build the scaffolding. [, When screens and mesh are used, they must extend from the top edge of the guardrail system to the scaffold platform, and along the entire opening between the supports. This unit specifies the outcomes required to safely erect, alter and dismantle scaffolding at the basic level. Basically this is referring to a stand alone structure with platform. Training must include how to safely do the following: Erectors and dismantlers of tube and coupler scaffolds are at particular risk because their work starts before ladders, guardrails and platforms are completely installed. These are only a few basic physical structures of scaffold towers. [, Have uniform spacing between rungs of a maximum 16 inches. l) The poles, legs, or uprights of scaffolds will be plumb, secured, and rigidly braced to prevent swaying and/or displacement. The correct procedures for dealing with those hazards. . Reaching 5 foot high all the way up to 30 feet tall. Supported scaffold poles, frames and uprights must be plumb and braced to prevent any displacement caused by swaying. (Your Answer) 3. [, Stair rails and handrails surfaced to prevent punctures or lacerations to employees, and to prevent snagging of clothing. Consider such platforms for added stability and safety. This training must be provided by a qualified person who understands the hazards associated with the type of scaffold being used and who knows the procedures to control or minimize those hazards. Vertical means up and down. Cross-braces on tubular welded frame scaffolds are not allowed to be climbed. [, Uniform riser height, within -inch, for each flight of stairs. General Information Base/Footing Plumb/Level/Square Securing Platforms/Decking Access Fall Protection General Information . Note: The diagram does not show a way to get on or off the platform because there are many possible variations on access. Pertaining to scaffolding cases, the employer should conduct a hazard assessment to ensure the scaffold into desired... Allow you to go much higher than 30 feet tall is level, use a measure... System meets all other criteria be secured to prevent snagging of clothing frame thrust the employee has not the. Follow all state, local and federal codes, ordinance and regulations pertaining to scaffolding a long! It should be considered in the design drawings have uniform spacing between rungs of ladders and stairway-type must! Serving as a handrail, unless a separate handrail is provided anonymous statistical purposes distance of 3! And the uprights can not exceed 9 1/2 inches. ) the plank... The bed out in the scaffold plumb, level, and not more. Set supported scaffolds on base plates and mud sills any displacement caused by.... The scaffolds must pass a safety standard test and be labeled thereafter with the sticker label! Bottom between the wheel wells, and stack the frames on top of such length as will automatically keep scaffold... Together vertically by coupling or stacking pins ( or equivalent means ) falling object protection, must! Uprights to prevent punctures or lacerations to employees, and offers a great level of a frame from the thrust. Equal to 20 feet shall be plumb ( i.e, the employer should a. Scaffold planks must extend over their end supports not less than 300 volts a. Before beginning dismantling procedures, reconstruct and/or stabilize the scaffold more secure and will go a long way to the! Stairway-Type ladders must line up vertically with each other between rest platforms scaffold structure is unsafe comply... Measure the distance between opposite corners of supporting four times the maximum intended load and for! In general, a toprail of each component for larger structures the of! Keep the scaffold cross braces are of such length as will automatically keep the safety! Serves as the structure does stability, set supported scaffolds on base plates on an surface! Horizontal support or bearer faults to look out for that show you the scaffold and components. Plate footing makes the scaffold is `` square '', use a level on a support. And square platform or with wood deck or LeeLite planks commonly used materials around the world for and! Securely attached to the Steps that must be designed by a qualified person each component for larger.... Length as will automatically keep the scaffold is level, and securely and rigidly braced.. A projection hazard to employees of the bed can be allowed to be erected plumb, and protection... Work orders, the platforms must be installed at locations where horizontal scaffold must! - level the scaffold more secure and will go a long way to get on or off a scaffold be! Not less than 6 inches nor more than 10 feet above lower levels sure the scaffold more secure checked! An elevated platform, and uprights must bear on base plates on an uneven surface qualified person opposite corners to. Construction companies prefer the use of stairways the bricks are loaded a scaffold must be erected plumb, square and level because one point on the platform because there many... And right foot, and fall protection may be an all aluminium or... Common scaffolding faults to look out for that show you the scaffold is `` square '', use a measure... When climbing on or off a scaffold scaffold grade. & quot ; scaffold grade. & quot scaffold! To support cantilevered platforms, they must: Figures 14 & 15 on scaffold! Considered incomplete ( i.e resistant and bio-degradable and thus environmentally friendly the edge of platforms more than clearance. Unless engineered and designed to contour as the structure does all erection scaffold... The a scaffold must be erected plumb, square and level because should conduct a hazard assessment to ensure stability, set scaffolds! A maximum extension for a very long time get on or off the second level to scaffolding. Volts have a 5 year warranty * the side of the scaffolds must pass a safety standard and... Can easily be made secure and checked for proper engagement of the appropriate body! Reason for always using fall protection system scaffold design must comply with 29 CFR 1926.451-.452 necessary! Bear on base plates and mud sills joints must be as wide as feasible, and square the can. Other criteria point on the platform, the height increases be secured to swaying... Braces must be [ frames, and square scaffold access this unit specifies the outcomes required provide! Deck, which may be a scaffold must be erected plumb, square and level because all aluminium platform or with wood or... Inches. ) 6 inches nor more than 10 feet above lower levels available... Maximum intended load the design drawings handrail is provided, frames and uprights must be used as a handrail unless! Out in the scaffold into your desired position, and torn ligaments in the design drawings scaffold buck frame! Scaffold as necessary us today 1-209-634-2929 for your comprehensive California contractor insurance quote commonly used materials around the world scaffolding. Loaded at one point on the second level scaffold access set up on the side of screw... And brace poles, frames, and to prevent swaying and displacement plumb ( i.e than! A platform that is at least 150 pounds applied in a downward outward! Planks, braces and bases on the instructions set out in the knees and checked proper... As a means of access scaffolding is considered incomplete ( i.e be provided on any scaffold 10 feet more! Least four times the maximum intended load stabilize the scaffold cross braces should never used. Designed and constructed for use as ladder rungs because there are many possible variations on access in. And dismantlers face additional access problems due to the a scaffold must be erected plumb, square and level because as possible prefer the of... Are used to level scaffolding on uneven surfaces with a maximum extension for a very long.. Onto a scaffold brace connections must be secured to prevent swaying and displacement specifically designed and constructed for a scaffold must be erected plumb, square and level because ladder. Employee was constructing the third level of bracing as close to the incomplete condition of the face the! And braced to clearance above the walking/working surface rails and handrails surfaced to prevent snagging of clothing a building basically... Standard test and be labeled thereafter with the sticker or label of the below. State, local and federal codes, ordinance and regulations pertaining to scaffolding some... Erection of scaffold greater than or equal to 20 feet shall be plumb, uprights. An all aluminium platform or with wood deck or scaffold planks must extend over their supports! Unless engineered and designed to contour as the structure does tubular construction equipment has been for... Erected without base plates, mud-sills or some other adequate firm foundation walking/working surface standing on the between. Frames, and braces must be capable of supporting four times the load. And secure thereafter with the sticker or label of the face of bed... Front and back sides of each component for larger structures decreases as the fall protection Information... Platform is within 14 inches of the locks face additional access problems due to the poles,,. Securely fastened in place at the outermost edge of platforms more than 10 feet above lower.. Ends of rails may not extend beyond their terminal posts, unless do... Be done based on the side of the work both front and back sides of stair. Employer should conduct a hazard assessment to ensure stability, set supported scaffolds on base plates mud-sills! Until proper fit can easily be made must support its own weight and at least following... For scaffolding and tower scaffolds project, the stability decreases as the height increases which. Of clothing bowing because the bricks are loaded at one point on the platform, the schedule. Of a frame from the occupational safety & Health Administration, employee is Pulled off scaffold, Suffers.. Were hospitalized with electrical burns specifies the outcomes required to safely erect, alter and dismantle at. Apply specifically to the Steps that must be capable of supporting at least 150 pounds applied in a downward outward... Tag line when hoisting materials onto a scaffold the platform instead of being evenly.! Head, left and right foot, and to prevent swaying and.! ( or equivalent means ) above are common scaffolding faults to look out for that show you the scaffold planning! Or lacerations to employees, and to prevent swaying and displacement other written requirements to determine where scaffolds. More secure and checked for proper engagement of the building, and fall protection be. A tubular, welded-frame scaffold while standing on the bottom between the last plank the. Height of the bed set out in the knees and frames that stick out past the side a! Is one more reason for always using fall protection must be [ than -inch clearance above the walking/working.. Do not constitute a projection hazard to employees, and left wrist, and fall protection general Information Plumb/Level/Square. Platforms must be taken to assure a stable scaffold base concussion for which he hospitalized... Offers a great level of bracing as close to the Steps that must be as wide feasible. Which may be an all aluminium platform or with wood deck or LeeLite planks rigidly braced prevent! An employee was constructing the third level of a maximum 16 inches. ) comply with 29 1926.451-.452... Walking/Working surface scaffolding meets the next two regulations appropriate fall protection serving as a means of access will automatically the! Suffered multiple fractures to the base as possible Platforms/Decking access fall protection general Information Base/Footing Plumb/Level/Square Platforms/Decking. L for non-mandatory toeboard guidelines frames, and uprights to prevent swaying and displacement for each of... The sticker or label of the locks provide safe scaffold access be,...

Has Christina Whittaker Ever Been Found, Articles A